Page citation
2026-08-11 · Board Packet · Page 39
Cached archive copy of a publicly posted LAPS document. This page text was extracted from the latest published cached archive copy for this resource.
Source Details
- Meeting date
- 2026-08-11
- Resource
- Board Packet
- Page
- 39
- Archived on
- 2026-09-22T15:00:27.764855+00:00
- Fetch method
- Direct download
- Checksum
- d905a216a1e2
- Text extraction
- Native PDF text
- Snapshot
- 2026-09-22T15:01:30.193752+00:00
- Document version
- 2026-08-11_board_packet_v1
Extracted Page Text
View page in cached archive copyP AT H FO R WA R D Priority 1 – Address Immediately P1-4 Wireless site survey & redesign, all 10 sites HIGHEST IMPACT P1-2 Resolve active power overloads (APs dropping now) CONFIG + HW P1-1 Fix switch instability district-wide P1-7 Stop the routing log flood CONFIG ONLYP1-3 Fix power budgets (per-port caps) CONFIG ONLY P1-6 Encrypt the open wireless network CONFIG ONLY P1-5 Obsolete hardware replacement plan URGENT P1-8 Restore time services CONFIG ONLY Prepared by ANM for Los Alamos Public Schools · Confidential 12